Timer and buzzer check – Southbend STRE-5EZ User Manual

Page 27

Advertising
background image

S

TRATO

S

TEAM

EZ

C

OUNTERTOP

S

TEAMER

S

ERVICE

O

WNER

S

M

ANUAL

1189953

(10/08) P

AGE

27

OF

56

Figure 15

Timer and Buzzer Check

Buzzer

Timer

1

3

Inside of Control Panel

Ohms

Continuity

1. DISCONNECT POWER AT CIRCUIT BREAKER.

2. Remove right side panel.

3. Set timer for one minute and allow to time out. If timer does not run, then replace timer.

4. Disconnect from the timer the wire that leads to the buzzer.

5. Disconnect connector PL1 to separate the other buzzer lead wire from the wiring harness.

6. Place test leads between positions 1 and 3 on the timer (as shown above).

7. Check for continuity when the timer has run down (so the buzzer should be on). If no continuity, replace timer.

8. Disconnect other lead wire from buzzer. Place test leads in terminals of buzzer lead wires (as shown above).

9. Check that resistance is approximately 3400

Ω. If it is not, replace the buzzer.

10. Reconnect wires.

Advertising