Programming 1 hand control - 2 beds – Select Comfort Precision Comfort Adjustable Foundation User Manual

Page 20

Advertising
background image

Precision Comfort™ Owners Manual

20

IF PROGRAMMING FAILS, INITIATE THE
PROGRAMMING PROCEDURE A SECOND
TIME.

NOTE

The three step procedure below is required to program 1 hand control to operate 2 beds.
Before beginning, make certain the beds are plugged into a working grounded electrical
outlet.

STEP 1

Locate the power down box for bed 1 and
press the learn button for 1 second and
release (FIGURE 16).

STEP 2

On the hand control, simultaneously press
and hold the POS 1 and the head massage
on/off buttons
(FIGURE 17). The
transmission indicator light will flash
slowly and then flash rapidly. Continue to
hold for 5 seconds and then release the
buttons.

STEP 3

Repeat Step 1 and Step 2 with bed 2
One hand control is now programmed to
operate two beds.

BED 1

BED 2

PROGRAMMING

1 hand control - 2 beds

LEARN

BUTTON

FIGURE 16: Power down box learn button.

POWER

DOWN BOX

POS 1

BUTTON

TRANSMISSION

INDICATOR LIGHT

FIGURE 17

HEAD MASSAGE

ON/OFF BUTTON

Advertising