Programming separating 2 beds – Select Comfort Precision Comfort Adjustable Foundation User Manual

Page 22

Advertising
background image

Precision Comfort™ Owners Manual

22

PROGRAMMING

separating 2 beds

The six step procedure below is required to separate 2 hand controls from operating 2 beds.
One hand control per bed operation will result. Before beginning, make certain the beds are
plugged into a working grounded electrical outlet.

STEP 1

Locate the power down box for bed 1 and
press the learn button for 1 second and
release (FIGURE 16).

STEP 2

On hand control 1, simultaneously press and
hold the POS 1 and the head massage on/off
buttons
(FIGURE 17). The transmission
indicator light will flash slowly and then flash
rapidly. Continue to hold for 5 seconds and
then release the buttons.

STEP 3

Repeat Step 1 and Step 2 with hand control 1.

Note: wait 90 seconds before proceeding to

Step 4.

STEP 4

Locate the power down box for bed 2 and
press the learn button for 1 second and
release. The bed will be equipped with
either a power down box or J box (FIGURE
16
).

STEP 5

On hand control 2, simultaneously press and
hold the POS 1 and the head massage on/off
buttons
(FIGURE 17). The transmission
indicator light will flash slowly and then flash
rapidly. Continue to hold for 5 seconds and
then release the buttons.

STEP 6

Repeat Step 4 and Step 5 with hand control 2.
Independent hand control operation is now
restored (hand control 1 operating bed 1;
hand control 2 operating bed 2).

HAND CONTROL 1

BED 1

HAND CONTROL 2

BED 2

IF PROGRAMMING FAILS, INITIATE THE
PROGRAMMING PROCEDURE A SECOND
TIME.

NOTE

LEARN

BUTTON

FIGURE 16: Power down box learn button.

POWER

DOWN BOX

POS 1

BUTTON

TRANSMISSION

INDICATOR LIGHT

FIGURE 17

HEAD MASSAGE

ON/OFF BUTTON

Advertising