Checking and testing operations – Samsung A6 User Manual

Page 44

Advertising
background image

E-

44

Checking and Testing Operations

C

OMPLETING THE

I

NSTALLATION

To complete the installation, perform the following checks and tests
to ensure that the air conditioner is operating correctly.

1

Review all the following elements in the installation:
◆ Installation site strength

◆ Piping connection tightness to detect any gas leakages

◆ Connection wiring

◆ Heat-resistant insulation of the piping

◆ Drainage

◆ Earthing wire connection

◆ Correct operations (follow the steps below)

2

Press the On/Off button.

Result:

◆ The indicator lights on the indoor unit flash at

half-second intervals.

◆ While the indoor unit opens, the indoor unit fan runs

to start.

3

Press the button.

Result:

The outdoor unit operates in cooling mode as
following the room temperature.

4

Air flow direction

Press the button and check that the air

flow blades work properly.

Advertising
This manual is related to the following products:

A2