13.2 Hauling the Tractor and Implement

Before transporting a loaded tractor and implement,
measure the height and width dimensions and gross
weight of the complete loaded unit. Ensure that the
load will be in compliance with the legal limits set for
the areas that will be traveled through. OPS-U- 0024

Use adequately sized and rated trailers and
equipment to transport the tractor and implement.
Consult an authorized dealer to determine the proper
equipment required. Using adequately sized chains,
heavy duty straps, cables and/or binders, securely tie
down both the front and rear of the tractor utilizing the
proper tie down locations as specified by the tractor
manufacturer. OPS-U- 0025

Arrange the chains so that when tightened, the
chains are pulling downward and against
themselves. Carefully tighten the securing chains or
other fasteners used as much as possible using
boomers or binders to apply maximum tension. Use
extreme care when attaching and removing the
securing devices as the extreme tension involved
when released has the potential to inflict serious
injury.

While hauling the tractor and implement, make
occasional stops to check that the tractor and
implement have not moved or shifted and that the
securing chains have maintained tension. If during transport a hard braking, sharp turning, or swerving action
was performed, stop at the next safe location to inspect the security of the load. OPS-U- 0026