SUPER MICRO Computer 6015TC-10G User Manual

Page 40

Advertising
background image

5-6

S

UPER

S

ERVER 6015TC-T/6015TC-10G User's Manual

Socket key

CPU installed in socket

PnP cap released

from load plate

3. Use your thumb and your index fi nger

to hold the CPU at opposite sides.

4. Align pin1 of the CPU (the corner

marked with a triangle) with the notched

corner of the CPU socket.

5. Find the corner of the CPU that

has a semi-circle cutout below a gold

dot (CPU key). This corner should be

aligned with the cutout on the socket

(socket key).

6. Once aligned, carefully lower the

CPU straight down into the socket. Do

not drop the CPU on the socket, do not

move the CPU horizontally or vertically

and do not rub the CPU against any sur-

face or any of the contacts, which may

damage the CPU and/or contacts.

7. With the CPU in the socket, inspect

the four corners of the CPU to make

sure that it is properly installed.

8. Use your thumb to gently push the

load lever down until it snaps into the

retention clasp.

9. If the CPU is properly installed into

the socket, the PnP cap will be auto-

matically released from the load plate

when the lever locks. Remove the cap.

Repeat steps to install a second CPU

if desired.

Warning! Keep the plastic PnP cap.

The serverboard must be shipped with

the PnP cap properly installed to protect

the CPU socket. Shipment without the

PnP cap properly installed will void the

warranty.

CPU key

CPU pin 1

Notched corner

Gold dot

Load lever

Advertising
This manual is related to the following products: