Risk of fire or asphyxiation if vent is not

assembled according to manufacturer’s instructions or if
vent parts from different manufacturers are mixed.
Vent
parts from different manufacturers ARE NOT interchange-
able. Mixing parts from more than one manufacturer may
cause leaks or damage to vent. When installing a vent,
pick one manufacturer and be sure that all vent parts come
from that manufacturer and are specified by the manufac-
turer for your system. Follow manufacturer’s instructions
and local and National Fuel Gas Code (U.S.) or
CSA B149.1, Natural Gas and Propane Installation Codes
(Canada) requirements carefully during assembly and
installation.
4. Install vent pipe so that it can expand and contract

freely as the temperature changes. Support the vent
pipe according to applicable codes and vent manufac-
turer’s instructions. Pipe support must allow the vent
pipe free movement out and back, from side to side, or
up and down as necessary, without putting a strain on
the heater or vent body. Slope horizontal pipe runs up

from the heater at least 1/4” per foot (2cm/M). Install
Listed condensate drains at low points where conden-
sate might collect. Plumb condensate drains to a drain
through hard piping or high-temperature tubing such
as silicone rubber or EPDM rubber – do not use vinyl
or other low temperature tubing. Follow drain manu-
facturer’s installation instructions.

5. Use Listed firestops for floor and ceiling penetrations.

Use Listed thimble for wall penetrations. Use a Listed
roof flashing, roof jack, or roof thimble for all roof pen-
etrations. Do not fill the space around the vent (that is,
the clear air space in the thimble or firestop) with
insulation. The roof opening must be located so that
the vent is vertical.

6. Vent Termination – Vertical (See Figures 12A and 12B,

Page 13, for height of vent termination above the roof.
See Table 7, Page 15, for Listed terminations.) Use a
Listed vent terminal specified by local and national
codes and your manufacturer’s instructions. A roof ter-
mination must be vertical. In Canada, the Vent Cap
location shall have a minimum clearance of 4 feet
(1.2M) horizontally from electric meters, gas meters,
regulators, and relief openings.

7. Vent Termination – Horizontal (See Table 7). Use a list-

ed wall thimble and vent terminal from Table 7.

The terminal must be located (U.S.-See Figure 13):
• at least 3” and at most 12” out from the wall (see Figure

14), following the vent manufacturer’s instructions.

• at least 12” above finished grade or the normally

expected snow accumulation level, whichever is higher

• at least 4 feet below or horizontally from, or 1 foot

above, any doors or windows or gravity air inlet to a
building

• At least 3 feet above any forced air inlet located within

10 feet

• At least 4 feet horizontally from electric meters, gas

meters, regulators and relief equipment

• At least 7 feet above grade adjacent to walkways or sim-

ilar traffic areas.

14

Brand

Manufacturer

Material Type

Sealant

Saf-T Vent

®

4”

Heat-Fab, Inc.

Metal

Consult Manufacturer

Special Gas Vent

38 Hayward Street

(Single Wall)

Greenfield, MA 01301
(800) 772-0739

Saf-T CI Vent

®

Heat-Fab, Inc.

Metal

Consult Manufacturer

Special Gas Vent

38 Hayward Street

(Double Wall)

Greenfield, MA 01301
(800) 772-0739

Z-Vent 4” Special

Z-Flex U.S., Inc.

Metal

G.E. RTV 106

Gas Vent (Type BH),

20 Commerce Park North

Model SVE

Bedrford, NH 03110-6911
(800) 654-5600

Table 5: Recommended Special Gas Vents (Positive Pressure)

Minimum Height

Roof Pitch

Above Roof*

Flat to 6/12

1 Ft.

6/12 to 7/12

1 Ft. 3 in.

>7/12 to 8/12

1 Ft. 6 in.

>8/12 to 9/12

2 Ft.

>9/12 to 10/12

2 Ft. 6 in.

>10/12 to 11/12

3 Ft. 4 in.

>11/12 to 12/12

4 Ft.

>12/12 to 14/12

5 Ft.

>14/12 to 16/12

6 Ft.

>16/12 to 18/12

7 Ft.

>18/12 to 20/12

7 Ft. 6 in.

>20/12 to 21/12

8 Ft.

* Vent must be at least eight (8) feet away from nearest vertical
surface. Vents extending five (5) feet or more above the roof must
be braced or guyed. Consult your local code officials for detailed
information.

Table 4: Vent Termination Height vs.

Roof Pitch – U.S.