Nstallation – Southbend SLEB/10CCH User Manual

Page 13

Advertising
background image

E

LECTRIC

C

ONVECTION

O

VENS

I

NSTALLATION

6. Lift the top oven and position it on top of the lower oven, as shown in the drawing below.

INSTALLATION

7. Move to the rear of the ovens and remove the six screws shown as items “A” in the left-hand drawing

below. Position the tie bracket (item “B”) as shown in the right-hand drawing below. Re-insert the
screws that you just removed through the holes in the tie bracket, but do not tighten them yet.

A

B

A

O

PERATOR

S

M

ANUAL

1181958

REV

2 P

AGE

13

Advertising
This manual is related to the following products: