Nstallation – Southbend SLEB/10CCH User Manual
Page 13
Advertising
E
LECTRIC
C
ONVECTION
O
VENS
I
NSTALLATION
6. Lift the top oven and position it on top of the lower oven, as shown in the drawing below.
INSTALLATION
7. Move to the rear of the ovens and remove the six screws shown as items “A” in the left-hand drawing
below. Position the tie bracket (item “B”) as shown in the right-hand drawing below. Re-insert the
screws that you just removed through the holes in the tie bracket, but do not tighten them yet.
A
B
A
O
PERATOR
’
S
M
ANUAL
1181958
REV
2 P
AGE
13
Advertising