Nstallation – Southbend SLEB/10CCH User Manual

Page 17

Advertising
background image

E

LECTRIC

C

ONVECTION

O

VENS

I

NSTALLATION

Step 4b: Installation of Optional Open Storage on Marathoner Gold Ovens Built Before

January 1, 2002

The following describes how to assemble the optional open storage for Marathoner Gold ovens built before
January 1, 2002. All holes are pre-drilled for the provided screws.

1. Attach the legs to the oven as described in installation Step 2a on page 9.

2. Attach the two frame hangers (items “A” in the following drawing) using four screws for each hanger.

The flange-side of each hanger must be on the side of the hanger closest to the edge of the oven.

INSTALLATION

LEGS NOT SHOWN

Install legs first!

Side View

Bottom View

A

A

A

3. Hang the rack guides from the frame hangers, which have two sets of holes. Use the outside holes if

you will be storing racks; use the inside holes if you will be storing pans (see the following drawing).

Holes

for

RACKS

Holes

for

PANS

O

PERATOR

S

M

ANUAL

1181958

REV

2 P

AGE

17

Advertising
This manual is related to the following products: