Step 5: connect electricity supply, Ge 19, Nstallation – Southbend SLEB/10CCH User Manual

Page 19

Advertising
background image

E

LECTRIC

C

ONVECTION

O

VENS

I

NSTALLATION

Step 5: Connect Electricity Supply

!

WARNING

ELECTRIC GROUNDING INSTRUCTIONS

This appliance, when installed, must be electrically grounded in accordance with local codes, or in the
absence of local codes, with the National Electrical Code, ANSI/NFPA 70 or the Canadian Electrical
Code, CSA C22.2
, as applicable.

INSTALLATION

Ovens are shipped wired for either single-phase or three-phase power according to the original factory
order. Wiring diagrams are located on the side of the control panel assembly, as well as in this manual
(beginning on page 43). Be sure that the input voltage and phase match the requirements shown on the
serial plate, which is located inside the lower front panel.

Conversion between single-phase and three-phase power can be performed in the field (see page 39).

The oven must be adequately grounded.

Use 167°F (75°C) wire for all supply lines.

The following drawing shows the locations of items referred to in the following procedure.

A

B

Contactor

Hole

Grounding Lug


1. CHECK THAT THE POWER SUPPLY CIRCUIT BREAKER IS OPEN.

2. Locate and remove the four screws that secure the lower front panel (items “A” in the drawing above).

Lift up the panel and pull it forward to remove it, then set it aside.

3. Locate and remove the now-accessible screw that secures the lower front corner of the side panel.

4. Locate and remove the five screws that secure the back edge of the side panel to the oven (items “B”

in the drawing above). Remove the side panel and insulation and set them aside.

5. Route the supply wires and the grounding wire through the hole on the back of the oven. Use a strain-

relief fitting.

O

PERATOR

S

M

ANUAL

1181958

REV

2 P

AGE

19

Advertising
This manual is related to the following products: