Operation, Opera t ion – Servis-Rhino F-4123C User Manual

Page 79

Advertising
background image

OPERATION

1585 01/11

Operation Section 4-33

© 2011 Alamo Group Inc.

OPERA

T

ION

Make additional passes until desired depth is
reached. During each pass, use only bucket
control while working depth. This will allow you to
concentrate on controlling bucket angle to
maintain a precise cut.

LOADING LOW TRUCKS OR SPREADERS FROM A PILE

For faster loading, minimize angle of turn and
length of run between pile and spreader. Back
grade occasionally with a loaded bucket to keep
working surface free of ruts and holes. Also, hold
lift control forward so full weight of bucket is
scraping ground.

Advertising