Cautions – Superior SSDVPF-CNE-B User Manual

Page 26

Advertising
background image

26

NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.

Step 5.

WIRING - OPTIONAL FORCED AIR

BLOWER KIT

FBK-100, FBK-200 and FBK-250 Kits

(See Figure 46 for wiring) -

An electrical receptacle is provided for the

installation of the FBK-100, FBK-200 and FBK-

250 forced air blower kits. Electrical power

must be connected to this receptacle in order

to operate these blowers. Install the blower

kits according to the installation instructions

provided with the kits.

Figure 45

Outlet Receptacle

Junction Box

Field-provided Metal Junction Box

Cover Plate With Screw

View Of Right

Bottom Corner Of Unit

Receptacle, Junction Box

and Cover Plate Installation

Fireplace

Side

Junction Box

knock-out (2

places each side)

Valve Access Side

Press snap

bushing into the

knock-out for

control switch

wires.

CAUTIONS

Remove the carton support from

the control compartment before

operating the appliance.

Ensure that wires are positioned

away from hot surfaces and sharp

edges.

Do not connect the optional wall

switch to a 120 Volt AC power

supply.

Electronic Wiring Diagram (Honeywell) Showing Blower Wiring for Optional FBK-100, FBK-200 & FBK-250 Kits

Schematic Representation Only

Relay Module C/W FBK-250 only. Plug blower

into J-Box receptacle for FBK-100 or FBK-200

application. See View A for J-Box wiring.

Optional Blower

*OFF/ON Switch

(Integral with

Gas Valve)

Honeywell

Electronic

Gas

Valve

120 VAC

Primary

Secondary

Optional Control Switch

Junction Box

Pilot Burner

Assembly

BL

BL

Field Wired
Factory

Wired

BK = BLACK BL = BLUE

R = RED W = WHITE

G = GREEN

BK

W

BK

BK

BL

R

GROUND

24 V

Transformer

View A

J-Box Wiring when

using unit mounted

relay module.

BK

W

G

CA

V

02

1

Igniter

Connector

* Leave the OFF/ON switch, which is

integral with the gas valve, in the ON

position.

**Optional Control Switches: Wall

Switch, Wall Thermostat or Remote

Control Receiver.

Notes:

1. If any of the original wire as supplied

must be replaced, use Type AWM 105°C

- 18 gage wire ONLY.

2. 120 VAC, 60 Hz - Less than 3 Amps.

Caution: label all wires prior to

disconnection when servicing controls.

Wiring errors can cause improper and

dangerous operation.

Junction Box

Tab Intact

Tab

Broken

Plug blower

into this

receptacle

n

e

e

r

G

-

d

n

u

o

r

G

* Wall-mounted

ON/ OFF Blower

Switch or Variable

Speed Control Switch.

Blower

Ground

e

ti

h

W

-

l

a

rt

u

e

N

120 VAC - Black

Green

Ground

Screw

White

Green

Neutral

Side of

Receptacle

Hot

Side of

Receptacle

Red

Black

J-BOX WIRING FOR

WALL SWITCH

BLOWER CONTROL

Figure 46

IMPORTANT NOTE

The gas valve OFF/ON switch is

shown in Figure 46 on Page 26. It

is integral with the gas valve and

should be set to the ON position.

5. Install a field-provided strain relief in the

cabinet knockout opening for the protection

of the power supply wires.

6. Connect the power supply wires to the

receptacle as shown in Figure 46 on Page

26.

7. Connect the ground supply wire to the green

wire attached to the outlet receptacle’s

green ground screw.

8. Wire and install the outlet receptacle to

junction box. Next, install into the chosen

corner of the control compartment as shown

in Figure 45.

9. After the receptacle/junction box wiring is

complete, install the field-provided metal

junction box cover plate (see Figure 45).

Note: The supplied 15 feet of 2 conductor

wire has one end of each conductor con-

nected to the gas valve circuit and the other

end of each conductor placed loose on top

of the appliance.

Advertising
This manual is related to the following products: