Step 3: mount lift cylinders, Figure a, Figure b – Stellar Industries SI-60 User Manual

Page 33: 27 installation 27

Advertising
background image

27

Installation 27

Step 3: Mount Lift Cylinders

A. Check frame for bolts, rivets, etc. and clearance required (Refer to the previous

pages) before placing the Lift Cylinder Weldment into place under the hoist sub-frame.

B. Install the cylinder weldment cross tube.

C. Install the Lift Cylinders and extend each cylinder rod 1/4”. Check the shaft to cylinder

dimension on both sides. Standard Lift Cylinders dimension should be 88 1/4” plus or

minus1/8”. Telescopic Cylinder dimension should be 61-1/4” plus or minus 1/8”. Be sure

to install proper cylinder shaft hardware so that Lift Cylinders do not interfere with truck

frame or bolts. The lift cylinders will precisely locate the lift cylinder weldments.

D. Clamp the Lift Cylinder Weldment in place and drill ten (10) 11/16” diameter holes as

per Figure B.

90.00 ±.13

DIMENSION WHEN INSTALLING.

ACTUAL RETRACTED DIMENSION IS 88"

Figure A

TRUCK FRAME

TRUCK FRAME

TYPICAL BOLT HOLE PATTERN

MOUNTING KIT - BOLTED ON

11/16" DIAMETER DRILL

PN C5902

WASHER 0.63 SAE

FLAT YELLOW GR8

CAP SCR 0.63-11X2.50

HHGR8

PN C1026

PN 24868

NUT 0.63-11

HHGR8 NYLOC

0.25

TYP 2

0.25

TYP 4

0.25

TYP 2

Figure B

0.25

TYP. 4

0.19

1.00

TYP. 4

Advertising
This manual is related to the following products: