Loading operation – Stellar Industries SI-60 User Manual

Page 13

Advertising
background image

7

Operation 7

Loading Operation

Back the truck up to the container
to be loaded and align the hoist rails
with the container long sills.

1

Engage the PTO and raise the hoist
until the rear roller is on the ground.

Set the parking brakes and retract
the reeving cylinders to connect the
cable to the container.

Release the parking brake and allow
the truck to roll under the container.
Extend the reeving cylinders to pull
the container onto the hoist. The
container long sills must be kept on
the hoist rollers.

Once the center of gravity of the
container is in front of the rear hinge,
the hoist can be lowered until the
front is just above the top of the
truck cab.

Continue pulling the container
forward until it is securely locked into
the front stops. Caution: Rear
hold-down devices are required
on the hoist and the containers.

Lower the hoist to the full-down
position and disengage the PTO.

2

3

4

5

6

7

Advertising
This manual is related to the following products: