Cable replacement, Bc d a, Cleanliness – Stellar Industries SI-60 User Manual

Page 21

Advertising
background image

15

Maintenance 15

Cable Replacement

Important: Standard replacement cable must be 7/8” diameter 6 x 37 extra improved plow steel

with steel core (6 x 37 EXIWRC) with a 4.00” swaged button x 75’ (174” & 182” CT, or) 77 feet (194”

CT) in length.

1. Remove the cable clamps and discard the old cable.

2. Inspect all the sheaves (See Inspection of Sheaves on page 12).

3. Install cable end onto cable. Thread cable through sheaves and guides, etc. Loop cable

through cable anchor and install clamps following the diagram below. Torque all bolts evenly

to 225 ft. lbs.

5.00

20.00

20.00

20.00

B

C

D

A

CABLE CLAMP DETAIL

CLAMP INSTRUCTIONS

INSTALL CLAMP "A" TORQUE NUTS TO 225 FT-LBS.

1.

INSTALL CLAMP "B" SNUG NUTS ON CABLE.

2.

INSTALL CLAMPS "C" & "D" AS SHOWN SNUG NUTS.

3.

APPLY TENSION TO CABLE.

4.

TORQUE NUTS ON "B", "C" & "D" TO 225 FT-LBS.

5.

CLAMP NUTS MUST FACE DOWN.

6.

Cleanliness

An important item in preserving the long life of the cable hoist is keeping

dirt, grime, and corrosive material out of the working parts. Thoroughly

wash and grease the cable hoist periodically.

Advertising
This manual is related to the following products: