Before proceeding any further, it

is necessary to raise the hoist

and set it down on the hoist

props.

1. Position the L-shaped clamp

between the sub-frame and

truck frame as shown below.

2. Assemble the lower clamp

and two (2) shims with a

5/8NC x 2-1/2” GD. 5 Cap

Screw, two (2) Flat Washers

and Self Locking Nuts. Trim the

lower clamp as required to

clear the frame channel.

Note: Stair-step the shims so fil-

let welds can be applied.

3. Tighten the bolts to the speci-

fied torque and weld the

plates and shims in position.

4. Do not weld to truck frame.

5/8”NC x 2-1/2”

GD5 Cap Screw

Hoist
Sub-Frame

Sub-Frame

Clamp

Truck

Frame

Sub-Frame
Shim

Sub-Frame
Clamp

5/8” STD.
Flat Washer

5/8” NC
Lock Nut

Weld

Weld

5/8” STD.
Flat Washer

Step 6: Hydraulic Plumbing Installation

Clean all hydraulic components and keep all hoses, tubes, valves, and fittings capped

until they are installed. Use pipe sealant on pipe thread joints only. (Do not use teflon

tape).

1. Install fittings and hoses as shown in parts illustration.

2. Note single stage Lift Cylinder plumbing and Telescopic Cylinder plumbing are different.

See hydraulics schematic/drawing for details.

POSITION CLAMP HERE

FOR REVERSE MOUNT MODELS

1

POSITION CLAMP HERE

FOR FORWARD MOUNT MODELS

FRAME RAIL

Step 5: Sub-Frame Front Clamp Installation

Advertising
This manual is related to the following products: