Prepare site, Prepare valve, Install valve – Kohler Coralais rite-temp bath and shower faucet 114522-2-CE User Manual

Page 4

Advertising
background image

114552Ć2Ć

CE

Kohler Co., Kohler, WI

4

PREPARE SITE

1.

ROUGHĆIN PLUMBING

Shut off the main water supply.

If the bathing fixture has been

installed, cover the fixture to

prevent damage to the surfaces.

Install or relocate the supply piping

as necessary.

NOTE

:

To improve clarity, the

plaster guard dome is not shown in

some of the illustrations.

SUPPORT FRAMING

Determine the location of the

showerhead, valve and spout.

Install the support framing.

PREPARE VALVE

2.

Carefully remove the stop nut

and stem assembly, valve cap,

collar and pressure balancing unit

before applying soldering heat to

the valve body.

Pressure

Balancing

Unit

Valve

Cap

With Stops

Without Stops

Valve Body

Collar

Stop

Nut

Stem

Assembly

Screws

INSTALL VALVE

3.

NOTE

:

A valve with the stops

installed is shown throughout the

instructions.
Install the valve on the support

framing so the UP" mark on the

valve is facing upward.

10" (25.4cm)

4" (10.2 cm)

48" (121.9cm)

TO FLOOR

72" (182.9cm) -

78" (189.1cm) TO

FLOOR (TYPICAL)

72" (182.9cm) -

78" (189.1cm)

(TYPICAL)

Bath/Shower

lation

Shower

Installation

Advertising