Connecting the cables, Checking the activity of the led lights, Connecting the cables -4 – Lucent Technologies 7820-0657-001 User Manual

Page 18: Checking the activity of the led lights -4

Advertising
background image

Connecting the cables

2-4

DSLPipe DSU (SDSL) User’s Guide

Table 2-2 shows the proper setting for each configuration

.

Connecting the cables

To connect your DSLPipe DSU:

1

Use the V.35 to DB-25 cable to connect the V.35 device to the DSLPipe
DSU.

2

Use the WAN cable to connect the DSLPipe DSU to the SDSL line.

3

Use the power supply cable to connect the DSLPipe DSU to a power source.
Plugging the power supply automatically turns on the DSLPipe DSU.

Checking the activity of the LED lights

To verify that your DSLPipe DSU is connected properly, observe the activity
pattern of the lights at the front of the unit (see Figure ). When all the cables are
connected, verify that:

The

con

light is on initially and then turns off. It blinks if there are any

SDSL errors.

The

wan

light turns on after the

con

light turns off. It blinks until a

connection is established, and then remains on.

The

lnk

light is on if the DSR (Data Set Ready) or the RTS (Request To

Send) control on the V.35 port is active.

The

act

light blinks when there is any DSL activity, but it remains off

otherwise.

The

pwr

light comes on and remains on.

Table 2-2. CPE vs. COE configuration

Configuration

DIP Switch 4

CPE

OFF

COE

ON

Advertising