Troubleshooting and repair – Lincoln Electric POWER MIG SVM170-A User Manual

Page 57

Advertising
background image

F-17

TROUBLESHOOTING AND REPAIR

F-17

POWER MIG 255C

9. Make the following voltage test:

a. Turn the machine OFF between

each test.

b. Carefully connect the meter probes

to the exposed lead connections.

c. Turn the machine ON to conduct

the voltage test.

10. If the DC voltage tested is incorrect or

missing, and the AC voltages are cor-
rect, the rectifier diode bridge may be
faulty.

6. Turn the POWER MIG 255C ON/OFF

POWER SWITCH to ON.

7. Carefully make the following voltage

tests:

a. Turn the machine OFF between

each test.

b. Carefully connect the meter plugs

to the exposed lead connections.

c. Turn the machine ON to conduct

the voltage test at J5 connector
Control board

8. If any of the AC voltages tested are

incorrect or missing, check the leads
and connections. See the wiring dia-
gram.

RECTIFIER DIODE BRIDGE TESTING (continued)

FROM

LEAD

208

209

TO

LEAD

206

206

EXPECTED

VOLTAGE

28 VAC

28 VAC

FROM

LEAD

354

TO

LEAD

206

EXPECTED

VOLTAGE

36 VDC

Retur

n to Section TOC

Retur

n to Section TOC

Retur

n to Section TOC

Retur

n to Section TOC

Retur

n to Master TOC

Retur

n to Master TOC

Retur

n to Master TOC

Retur

n to Master TOC

Advertising