Installation, Safety precautions, Warning – Lincoln Electric COOL ARC 35 IM959 User Manual

Page 9

Advertising
background image

A-2

INSTALLATION

COOL ARC® 35

A-2

SAFETY PRECAUTIONS

Connecting the COOL ARC® 35 to a power

source:

1. Disconnect all power to the power source.

2. Turn the power source on its side revealing the Cooler

Access Panel on the bottom.

3. Loosen the fasteners and remove the Panel. Keep the fas-

teners to reattach the Panel.

4. Place the COOL ARC® 35 near the V310-T/V311-T and push

the lead harness from the cooler through the grommet in the

Access Panel that was just removed from the power source

(making sure that the direction of the leads going through the

panel is correct).

5. Attach the two plugs from the COOL ARC® 35 harness into

the mating receptacles inside the power source where the

Cooler Access Panel was removed (making sure that these

connectors “lock” into the mating receptacles).

6. Slide the Access Panel up the harness toward the power

source and reattach using the fasteners that were removed.

NOTE: Make sure that the grommet or the harness itself does

not put any stress on the connectors when closing up the Panel.

7. Place the power source on top of the cooler locating the feet

of the power source into the mating foot prints in the cooler

case front and back.

8. Secure the power source to the cooler with the four fasteners

that were included with the cooler.

9. Unscrew the coolant reservoir cap and remove the clear plug

(keep for transporting the cooler when filled with coolant).

The clear plug should never be installed when operating the

cooler - it will prevent proper venting. Fill the reservoir with

coolant per the Recommended Coolant section on the TECH-

NICAL SPECIFICATIONS page. The reservoir is full when

the coolant reaches a level just below the cap.

10. The system is now ready for water cooled torch

applications.

Connecting a water-cooled torch:

1. Disconnect all power to the power source.

2. Assemble the torch per the instructions included

with the torch and Twist-mate Adapter.

3. Connect the HOT water return hose (normally RED)

to the Coolant Inlet on the front of the cooler.

Depending on the type of hose connectors on the

torch, it may be necessary to use brass couplers

that are included with the cooler.

4. Connect the COLD water to the torch hose (normal-

ly BLUE) to the Coolant Outlet on the front of the

cooler.

5. Attach the twist-mate from the torch to the DC neg-

ative (-) Electrode/Gas output terminal on the power

source.

6. Turn the power ON to the power source.

7. The cooler Display will illuminate and go through

initialization. The cooler will enter into standby

mode if a Stick welding mode is selected.

8. Press the push button on the cooler to begin the

priming procedure. The cooler display will show

dashed lines moving in a circular motion.

9. The torch is now ready for water-cooled welding

applications.

Note: If E43 alarm codes are encountered, the torch

has not been properly primed. Run the priming

procedure again by pressing the cooler push

button.

WARNING

ELECTRIC SHOCK

can kill.

• Disconnect input power by remov-

ing plug from V310-T/V311-T before

working inside Cooler.

• D o n o t t o u c h e l e c t r i c a l l y “ h o t ”

parts inside Cooler.

• Have qualified personnel do the installation,

maintenance and troubleshooting work.

----------------------------------------------------------------------

Advertising