Operation, Wire loading, Warning – Lincoln Electric LN-7 GMA WIRE FEEDERS User Manual

Page 37

Advertising
background image

B-8

OPERATION

B-8

WIRE LOADING

WIRE REEL LOADING – READI-REELS
AND SPOOLS

TO MOUNT A 30 LB READI-REEL PACKAGE
USING THE MOLDED PLASTIC K363-P TYPE
ADAPTER:

1. Make certain that the threaded locking collar is

tight and securely locks the adapter on the
spindle. See Figure B.5.

2. Rotate the spindle and adapter so the retaining

spring is at the 12 o’clock position.

3. Position the Readi-Reel so that it will rotate in a

clockwise direction when feeding (wire is to be
de-reeled from the bottom of the coil).

4. Set one of the Readi-Reel inside cage wires on

the slot in the retaining spring tab.

5. Lower the Read-Reel to depress the retaining

spring and align the other inside cage wires with
the grooves in the adapter.

6. Slide the cage all the way onto the adapter until

the retaining spring “pops up” fully.

Check to be sure the retaining spring has been
fully returned to the locking position and has
SECURELY locked the Readi-Reel cage in place.
Retaining spring must rest on the cage, not the
welding electrode.

------------------------------------------------------------------------

7. To remove the Readi-Reel from the adapter,

depress the retaining spring with thumb while
pulling the Readi-Reel cage from the adapter with
both hands. Do not remove the adapter from the
spindle.

LN-7 & LN-7 GMA

WARNING

2 IN. O.D. SPINDLE

ADAPTER

RETAINING SPRING

BRAKE

HOLDING

PIN

GROOVES

READI-REEL

INSIDE CAGE WIRES

THREADED

LOCKING

COLLAR

FIGURE B.5 – INSTALLING A 30 LB READI-REEL PACKAGE.

Advertising
This manual is related to the following products: