Initial power up and self-test – Printek Mt3-II Series User Manual

Page 14

Advertising
background image

Operation

Initial Power Up And Self-Test

Once the Battery is charged and the paper is loaded, perform an initial power up self-test.

1. To start the self-test, press and hold the FEED button, then press ON . The printer will start printing

the self-test messages.

2. Press the OFF or FEED to stop or cancel the self-test print.

The first few lines of self-test show the printer firmware version, the current printer settings and a list of any
optional or special features installed. Also, sample lines are printed using the printer resident fonts and bar
codes.

8

Advertising