Quick start procedure, Network cabling examples, Power – Paradyne 3162 User Manual

Page 4

Advertising
background image

2

Quick Start Procedure

The following procedure is for experienced DSU/CSU users who are familiar with the
3162 DSU/CSU installation process and have no special requirements for their
application. See the

ACCULINK 3162 Data Service Unit/Channel Service Unit User’s

Guide for more information.

1. Attach the power cord to the rear of the DSU/CSU and the other end to a grounded

115 Vac power outlet.

2. Attach the 3162 DSU/CSU network connection to the T1 network using the

appropriate cable. Attach the 3162 DSU/CSU to the customer premises equipment
via the DTE (DSX-1) and/or port connectors.

3. Power on the DSU/CSU to perform the power-up self-test.

97-15575

Power

Power

3162

DSU/CSU

3162

DSU/CSU

Terminal

COM

Port

Network

Port

COM

Port

Network

Port

SNMP

Manager

or

Terminal

or

PORT 1

AUX

POWER

NETWORK

CAUTION:

AUX PORT OR COM PORT MUST NOT BE CONNECTED TO PSTN OR T1 NETWORK

NEC

CLASS 2

INPUT

COM

PORT 2

DSX-1

EXT. CLOCK

PORT 1

AUX

POWER

NETWORK

CAUTION:

AUX PORT OR COM PORT MUST NOT BE CONNECTED TO PSTN OR T1 NETWORK

NEC

CLASS 2

INPUT

COM

PORT 2

DSX-1

EXT. CLOCK

NETWORK

Cabling Examples

Advertising