Servicing information 91 – Perle Systems PERLE P850 User Manual

Page 97

Advertising
background image

Servicing Information

91

RS530 / RS422 Null-Modem Cable

Shield

Transmitted Data (A)

Transmitted Data (B)

Received Data (A)

Received Data (B)

Request To Send (A)

Request To Send (B)

Clear To Send (A)

Clear To Send (B)

DCE Ready (A)

DCE Ready (B)

DTE Ready (A)

DTE Ready (B)

Signal Ground

Received Line Signal Detector (A)

Received Line Signal Detector (B)

Transmit Timing (A) DCE Source

Transmit Timing (B) DCE Source

Receiver Timing (A) DCE Source

Receiver Timing (B) DCE Source

Local Loopback

Remote Loopback

Transmit Timing (A) DTE Source

Transmit Timing (B) DTE Source

Test Mode

Clear To Send (A)

DB25 MALE

1

2

14

3

16

4

19

5

13

6

22

20

23

7

8

10

15

12

17

9

18

21

24

11

25

DB25 MALE

1

3

16

2

14

6

22

5

13

4

19

8

10

7

20

23

24

11

17

9

18

21

15

12

25

Transmitted Data (A)

Received Data (A)

Transmitted Data (B)

Received Data (B)

DCE Ready (A)

DCE Ready (B)

Clear To Send (B)

Request To Send (A)

Request To Send (B)

Received Line Signal Detector (A)

Received Line Signal Detector (B)

DTE Ready (A)

DTE Ready (B)

Signal Ground

Transmit Timing (A) DTE Source

Transmit Timing (B) DTE Source

Local Loopback

Remote Loopback

Receiver Timing (A) DCE Source

Transmit Timing (A) DCE Source

Transmit Timing (B) DCE Source

Test Mode

Shield

Receiver Timing (B) DCE Source

Figure C-13 RS530 / RS422 Null-Modem Cable

The connecting cable must be a shielded cable.
Circuits which are paired (contain an (A) and (B) reference)

should be connected to twisted pairs within the connecting cable.
This cable is needed when it is necessary to connect two units back-to-

back and a set of modems is not available. Note that this cable

specifies DB25 connectors on each end to allow direct connection to

the link interface connector on each unit. The link speed must be

defined for each of the two units.

Advertising