Installation checklist, Site log, Sample site log entries – Patton electronic SmartNode 4400 User Manual

Page 25: Table 4

Advertising
background image

Planning the installation

25

SmartNode 4400 Series Getting Started Guide

3 • Hardware installation

Installation checklist

The installation checklist (see

table 4

) lists the tasks for installing a SmartNode 4400 Series IpChannel Bank.

Make a copy of this checklist and mark the entries as you complete each task. For each SmartNode 4400,
include a copy of the completed checklist in your site log. This installation checklist is also available in appen-
dix F,

“Installation checklist”

on page 66.

Site log

Patton recommends that you maintain a site log to record all actions relevant to the system, if you do not
already keep such a log. Site log entries should include information such as listed in

table 5

.

Table 4. Installation checklist

Task

Veryfied by

Date

Network information available & recorded in site log
Environmental specifications verified
Site power voltages verified
Installation site pre-power check completed
Required tools available
Additional equipment available
All printed documents available
SmartWare release & build number verified
Rack, desktop, or wall mounting of chassis completed
Initial electrical connections established
ASCII terminal attached to console port
Cable length limits verified
Initial configuration performed
Initial operation verified

Table 5. Sample site log entries

Entry

Description

Installation

Make a copy of the installation checklist and insert it into the site log. (See
appendix F,

“Installation checklist”

on page 66.)

Upgrades & maintenance Use the site log to record ongoing maintenance and history
Configuration changes

Record all changes and the reasons for them

Maintenance

Schedules, requirements and procedures performed

Comments

Notes and problems

Software

Changes and updates to SmartWare software