Connecting power, Grounding the model sn4400-ac and dc units, Grounding the model sn4400—ac and dc units – Patton electronic SmartNode 4400 User Manual

Page 30: Db-9-to-rj-45 cable diagram, Connecting the eia-561 rs-232 configuration port, Dce configured)

Advertising
background image

Installing the IpChannel Bank

30

SmartNode 4400 Series Getting Started Guide

3 • Hardware installation

Connecting the EIA-561 RS-232 configuration port (DCE configured)
Install the supplied RJ-45-to-RJ-45 cable with the DB9-RJ45 adapter between the SN4400 IpChannel Bank
RS-232 console port (

figure 10

) and an open serial port on your computer. If you need to assemble your own

cable, refer to the pinout diagram in

figure 10

.

Figure 10. DB-9-to-RJ-45 cable diagram

Connecting power

In connecting to the power source, it is important to establish a good grounding connection first, then the
power connection. This section explains:

Making the ground connection for either AC or DC units (see section

“Grounding the Model SN4400—

AC and DC units”

)

Connecting to an AC power source (see

“Installing the power cables—AC units”

on page 31)

Connecting to a DC power source (see

“Installing the power cables—DC units”

on page 32)

Grounding the Model SN4400—AC and DC units
Do the following:

1. Assemble a ground wire using #10 AWG wire with green-colored insulation and two ring terminals. Make

the wire long enough to reach one of the following earth ground sources:

– The building ground rod (generally located at the site’s main service entrance)

– A sprinkler system pipe

– A cold-water pipe

– Building structural steel

6 DSR
1 CD
4 DTR
5 SG
2 RD (driven)
3 TD (received)
8 CTS
7 RTS

1

2

3

4

5

6

7

8

DSR & DTR are internally

wired together

RJ-45 Jack

Signal Name

DB-9

Advertising