Figure 9 – ParaBody GS2 User Manual

Page 11

Advertising
background image

FIGURE 9

11

0

1

2

3

4

5

6

1/2

1/2

1/2

1/2

1/2

1/2

STEP 9

• SECURELY TIGHTEN ALL FRAME CONNECTION BEFORE PROCEEDING TO NEXT STEP

33

37

60

48

9

1/2 X 8-3/4”

SECURELY
TIGHTEN

SECURELY TIGHTEN top of both SHAFT COLLARS (48) flush to bottom of both BOOM PLATES (4),(5)

1

40

• Assemble the PRIMARY PIVOT (9) of the PRESS ARM ASSEMBLY to the top of the FRAME (1) using 1/2 X 8-3/4” BOLT (33),
two 1/2” FLAT WASHERS (37) and 1/2” LOCK NUT (60).

• Insert one 3/4 x 4” SHAFT (40) into both 3/4” FLANGE BEARINGS on FRAME (1)

Advertising