Figure 14 – ParaBody GS2 User Manual

Page 16

Advertising
background image

16

0

1

2

3

4

5

6

1/2

1/2

1/2

1/2

1/2

1/2

FIGURE 14

• Refer to cable ILLUSTRATION “A” on page 14 for cable routing while installing pulleys.

STEP 14:

• Assemble one 3-1/2” PULLEY (24) to the FRAME (1) using one 3/8 X 3-3/4” BOLT (30), two 3/8 X 1-1/16”
FLANGE SPACERS (42), one 3/8” LOCK NUT (34) and tighten securely

• Assemble one 3-1/2” PULLEY (24) into the PRIMARY PIVOT (9) lower hole using one 3/8 X 8-3/4” BOLT (31),
two 3/8” FLAT WASHERS (36), two 3/8 X 1-1/2” SPACERS (44) and one 3/8” LOCK NUT (34) and tighten securely.

• Assemble two 3-1/2” PULLEYS (24) between the left and right BOOM PLATES (4) and (5) using two 3/8 X 3-3/4” BOLTS (30),
two 3/8 X 1” SPACERS (43), two 3-1/2” CABLE GUARDS (38) and two 3/8” LOCK NUTS (34)

• Loosely assemble one 3-1/2” PULLEY (24) between PULLEY PLATES (12) using one 3/8 X 1-3/4” BOLT (27) and
one 3/8” LOCK NUT (34).

30

31

43

42

44

36

27

12

9

1

34

24

3/8 X 1-3/4”

3/8 X 3-3/4”

38

3/8 X 8-3/4”

Advertising