Figure 16 – ParaBody GS2 User Manual

Page 18

Advertising
background image

18

• Refer to cable ILLUSTRATION “A” on page 14 for cable routing while installing pulleys.

STEP 16:

[CABLE MUST BE POSITIONED BETWEEN PULLEY AND LOWER BOLT ASSEMBLY ON
LEG PEDESTAL (11) AND FRAME (1)]

30

34

34

24

36

11

1

FIGURE 16

3/8 x 3-3/4”

3/8 x 3” 29

42

• Securely assemble the ball end of the LOW CABLE (21) and one 3-1/2” PULLEY (24) to the LEG PEDESTAL (11) using two
3/8 X 3-3/4” BOLTS (30), two 3/8” X 1-1/16” FLANGE SPACERS (42), two 3/8” WASHERS (36), and two 3/8” LOCKNUTS (34).

(NOTE: The LEG CABLE (21) should be routed over the retaining bolt as shown in FIGURE 16.)

• Securely assemble one 3-1/2” PULLEY (24) and two 3/8 X 3/4 FLANGE SPACERS (41) to the FRAME (1) using one 3/8 X 3”

BOLTS (29), and one 3/8” LOCKNUT (34). (NOTE: The LEG CABLE (21) should be routed over the retaining bolt as shown
in FIGURE 16.)

21

41

Advertising