Operational change in smartmodule systems – Nortech Systems Adept RS-232/TERM User Manual

Page 22

Advertising
background image

Chapter 1 - Introduction

22

Adept SmartController User’s Guide, Rev. E

Operational Change in SmartModule Systems

When a CAT-3 SmartController is used in an Adept SmartModules system, or an Adept
Servo Kit system, that includes a PDU-2, there is a minor change in operation compared to
the original SmartController. The sequence would be:

1. In a SmartModule system with a CAT-3 SmartController, while operating in

Manual Mode, power is turned off by releasing the Enable switch on the MCP.

2. To re-enable power, the user must press and hold the Enable switch.

3. Next the user must press the Cmp/Pwr button on the MCP.

4. Then the user must press the High Power button on the Front Panel to turn on

High Power to the robot. The LCD display on the MCP will instruct the user to
press the button. The button will be blinking, and must be pressed within 10
seconds. (Ten seconds is the default timeout for the High Power button to be
pressed. This timeout can be changed using the CONFIG_C utility.)

Advertising
This manual is related to the following products: