Installation instructions – NEC RIH-6867 User Manual

Page 20

Advertising
background image

Installation instructions

Piping Joints Thermal Insulation:
Wrap the piping joints with thermal
insulation materials and then wrap
with a vinyl tape.

Piping Thermal Insulation:

a. Place the drain hose under the piping.
b. Insulation material uses polythene foam over 6mm in thickness.

Note: Drain hose is prepared by user.

Drain pipe should point downward for easy drain flow.
Do not arrange the drain pipe twisted, sticking out or wave
around, do not immerse the end of it in water.

If an extension drain hose is connected to the drain pipe, make
sure to thermal insulated when passing along the indoor unit.

When the piping is directed to the right, piping, power
Cord and drain pipe should be thermal insulated and
fixed onto the back of the unit with a piping fixer.

Thermal insulation

wrapped with vinyl type

Small
pipe

Large pipe

Thermal insulation

tube

Power connecting cord

Drain hose
(prepared by user)

A. Insert the pipe fixer to the slot.

B. Press to hook the pipe fixer onto the base.

Base

Base

Base

Piping fixer

Piping fixer

Hook here

Insert here

drain
hose

drain
hose

large
pipe

large
pipe

small
pipe

small
pipe

b. Pre-tighten them with fingers at first, then use the wrenches.

a. Connect indoor unit pipes with two wrenches. Pay special attention

to the allowed torque as shown below to prevent the pipes, connectors
and flare nuts from being deformed and damaged.

Piping Connection:

Pipe size

Model

24K

24K

0.6mm

0.6mm

22mm
27mm

3.5kg.m
7.5kg.m

Liquid Side (3/8 inch)

Gas Side (5/8 inch)

Torque

Nut width

Min.thickness

18

Note: The connection pipe will be provided or purcha sed by cus tomer.

PDF created with pdfFactory Pro trial version

www.pdffactory.com

Advertising