What’s next – Nortel Networks CALLPILOT 555-7101-226 User Manual

Page 43

Advertising
background image

November 2005

Preinstallation requirements

Part 2: 703t Server Hardware Installation

43

The following diagram shows how to: 1) align the tabs, 2) engage the cover
and 3) tighten the thumbscrews.

What’s next?

If you want to install the chassis feet on the bottom of the server, continue
with “Installing the chassis feet” on page 44. Otherwise, continue with the
hardware installation. For more information, see “Installation checklist” on
page 32
.

G101762

Top and
bottom tabs
on cover

Top and
bottom slots
in chassis

1

2

3

Advertising