What’s next – Nortel Networks CALLPILOT 555-7101-226 User Manual

Page 45

Advertising
background image

November 2005

Preinstallation requirements

Part 2: 703t Server Hardware Installation

45

1 Ensure that the server is laying on its side, supported to give the server

bottom four to five inches clearance above the work surface.

2 Attach the feet as shown in the preceding diagram.

Use four screws to attach each foot to the chassis. The holes in the feet
line up with only one set of holes in the chassis, as follows:

„

front foot: The middle hole is towards the front of the chassis.

„

back foot: The middle hole is towards the back of the chassis.

3 Place the server on its feet.

What’s next?

Continue with the hardware installation. For more information, see
“Installation checklist” on page 32.

Advertising