Rheem 136-1826 User Manual

Page 11

Advertising
background image

MODELS 512 - 825

Step 1: Lower outdoor "Stackless" top on to unit.

Position top so it is centered on unit from
side to side and front to rear.

Fig. # 8166.1

Step 2: Tighten the (4) screws (Shown below) until

they come in contact with the unit jacket top,
then evenly tighten all (4) screws to secure to
unit.

JACKET TOP

FASTENING
SCREW

Fig. # 8233

MODELS 926-1758

Heater shipped with outdoor vent terminal factory

installed.

INDOOR HEATERS
Indoor Installations

MODEL 136

Step 1: Shut off main electrical per switch to heater.
Step 2: Turn heater manual switch located in upper

control panel to the "OFF" position.

Step 3: Shut off gas supply and water supply to the

heater.

Step 4: Mount drafthood on boiler and attach with the 4

sheet metal screws provided. Drafthood should
be positioned with the vent sensor located on
the front left side as shown.

Step 5: Remove plastic plug from left side of boiler

jacket and install the plastic grommet provided.

Step 6: Route flue sensor wire harness through the

grommet installed in Step 5.

TEMPERATURE
SENSOR

SENSOR
SHIELD

MOUNTING

JACKET

SCREWS

TOP

HARNESS

CONTROL

ASSY.

PANEL

HEATER
ON/OFF
SWITCH

LOWER
DOOR

GROMMET

Fig. # 8946

2. Snap tabs into keyholes so as not to pull out.

11

Advertising