Rheem 136-1826 User Manual

Page 13

Advertising
background image

MODELS 512 - 825

Locate and assemble as shown below. Secure with
screws supplied in envelope in carton

Fig. #8167.0

13

MODELS 181-399

Step 1. Shut off main electrical power switch to heater.
Step 2. Turn heater manual switch located in upper control panel to the "OFF" position.
Step 3. Shut off gas supply and water supply to the heater.
Step 4. Mount drafthood on top of boiler as shown on page 8. Drafthood should be positioned with the vent

sensor located on the front right side as shown.

Step 5. Remove plastic plug from left side of boiler jacket and install plastic grommet provided.
Step 6. Route flue sensor wire harness through the grommet installed in Step 5.
Step 7. Remove door and locate wire from roll out sensor to hi limit with the male/female connector.
Step 8. Disconnect male/female connector and attach to the 2 wires from draft hood vent sensor harness.

HEATER BEFORE

DRAFTHOOD

INSTALLATION

Fig# 9349

HEATER AFTER

DRAFTHOOD

INSTALLATION

Fig# 9350

Advertising