Important, 2004 roberts-gordon – Roberts Gorden Vantage TF-Series User Manual

Page 33

Advertising
background image

ROBERTS GOR DON

®

T F-S

E RIE S

S

UB MI TT AL

S

HEE T

© 2004 Roberts-Gordon

APPL ICATION S, ENGI NEE RING AND DET AI LE D GUID ANCE ON SYST EMS DE SIGN, INSTAL LATI ON AND PRODUCT PE RFORMANCE IS AVAI LABLE UPON RE QUEST. ROBERT S GORDON

®

PRODUCT S ARE T O BE

INSTAL LE D ONL Y IN ACCORDANCE WI TH L OCAL L AWS, CODES AND REGUL AT IONS, AND ONLY BY A CONT RACT OR QUALI FIE D I N THE I NST ALL AT ION AND SE RVICE OF GAS-FIRE D HE AT ING EQUI PME NT.

CFlexible Boot Installation (Single Vent)

Common Sidewall Venting

Tube

Vent

Boot Clamp

Flexible Boot

Vent Sleeve

Bead

3"

(8 cm)

3"

(8 cm)

2"

(5 cm)

Expansion

Gap

Flexible Boot Installation

for Single Vent

Boot Clamp

Single Wall

Vent Pipe

Flexible

Boot

Tube

Bead

2” min.

(5 cm)

Description

Part Num ber

Rolled Sleeve

09080000

Flexible Boot 4" (10 cm)

91412800

Boot Clamp 4" (10 cm)

91901300

Burner

Tube

Vent Terminal

Combustible or

Non-Combustible

Wall

6" (15 cm) Single Wall Pipe

Flexible

Boot

*

6" (15 cm)

Vent Pipe

Vent Tee

Boot

Clamp

*

IMPORTANT

Compress boot on installation

to allow at least 2" (5 cm) of

movement on each side for

thermal expansion of tube

away from the tee.

Plan View

Description

Part Number

Vent Tee

91916100

Vent Terminal 6" (15 cm)

90502101

Advertising