Important, 2004 roberts-gordon – Roberts Gorden Vantage TF-Series User Manual

Page 34

Advertising
background image

ROBERTS GORDON

®

T F-S

E RIE S

S

U BMI TT AL

S

HEE T

© 2004 Roberts-Gordon

APPLI CAT IONS, ENGIN EE RING AND DE TAI LE D GUIDANCE ON SYST EMS DE SI GN, I NSTALL ATION AND PRODUCT PE RFORMANCE I S AVAIL ABL E UPO N REQUE ST. ROBERTS GO RDON

®

PRODUCTS ARE TO BE

INSTAL LE D ONLY I N ACCOR DANCE WIT H L OCAL L AW S, CODES AND RE GULAT IONS, AND ONLY BY A CONTRACTO R QUALI FIE D IN THE INST AL LAT ION AND SE RVICE OF GAS-F IRE D HEAT ING E QUIPMEN T.

Vertical Ventilation 6" (15 cm) Pipe

Flexible Boot Installation (Common Vent)

Vent Terminal

6" (15 cm) Single

Wall Pipe

Burner

Tube

Roof

Flexible

Boot

6" (15 cm)

Vent Pipe

Vent Tee

Boot Clamp

Plan View

*

IMPORTANT

Compress boot on installation to allow at least

2" (5 cm) of movement on each side for thermal

expansion of tube away from the tee.

*

Descri ption

Part Num ber

Vent Cap 6" (15 cm)

90502302

6"

18"

11"

6" (15 cm)

Tube

8" ( 20 cm) long Flexible

Boot Compressed

to 6" (15 cm) long

Vent Tee

3.5"

(9 cm)

3"

(8 cm)

3/4" (2 cm)

Rolled Sleeve Installation

for Common Vent

Expansion

Direction

3"

(8 cm)

Descri ption

Part Num ber

Rolled Sleeve

09080000

Flexible Boot 4" (10 cm)

91412800

Boot Clamp 4" (10 cm)

91901300

Vent Tee - 4" Dia. x 4" Dia. x 6" Dia.

91916100

Advertising