2 hauling the tractor and implement, Hauling the tractor and implement -37, Operation – Rhino Mounts RHD88 User Manual

Page 127: Opera t ion

Advertising
background image

OPERATION

RHD 02/11

Operation Section 4-37

© 2011 Alamo Group Inc.

OPERA

T

ION

14.2 Hauling the Tractor and Implement

Before transporting a loaded tractor and implement,
measure the height and width dimensions and gross
weight of the complete loaded unit. Ensure that the
load will be in compliance with the legal limits set for
the areas that will be traveled through. OPS-U- 0024

Use adequately sized and rated trailers and
equipment to transport the tractor and implement.
Consult an authorized dealer to determine the proper
equipment required. Using adequately sized chains,
heavy duty straps, cables and/or binders, securely tie
down both the front and rear of the tractor utilizing the
proper tie down locations as specified by the tractor
manufacturer. OPS-U- 0025

Advertising
This manual is related to the following products: