Chapter 2. Installation

ARC-101 Installation & Operation Manual

2-2

Rack Mounting Instructions

2.3 Site Requirements

Power

The ARC-101 is powered by 90/260 VAC or -48 VDC.

The unit should be installed within 1.5 meters (5 ft.) of an easily accessible
grounded AC outlet capable of supplying the appropriate voltage
(90/260 VAC).

Front and Rear
Panel Clearance

Allow at least 90 cm (36 inches) of clearance at the front of the unit for
operator access. Allow at least 10 cm (4 inches) clearance at the rear of the
unit for power cord connection.

Ambient
Requirements

The ambient operating temperature of the ARC-101 should be 0

°

C to 45

°

C

(32

°

F-113

°

F), at a relative humidity of up to 90% non-condensing.

2.4 Rack Mounting Instructions

Installation of
a Single Unit

Rack adapter components for installing a single unit include one short
bracket and one long bracket. Each bracket is fastened to the side walls of
the unit by two screws (with flat washers) which are inserted into the two
front holes on the side wall (the unit is supplied with nuts already in place
on the inner side wall). Note that the short bracket fastens to the left side of
the unit, and the long bracket to the right side of the unit (see Figure 2-1).

Once the brackets are fastened to the side walls, the unit is ready for
installation in the 19" rack. Place the unit in the rack, and fasten the
brackets to the side rails of the rack by means of the two screws situated on
each side (not included in the kit).

Figure 2-1 Installation of a Single Unit