54 finalizing the installation, Bc d, For qualified installers only) – Omni Group GREEN SMART 864 User Manual

Page 54

Advertising
background image

54

Finalizing the Installation

(for qualified installers only)

© Travis Industries

4090507

100-01217_000

4

Remove the pilot orifice following the instructions below. Replace with the propane pilot orifice

Lift the pilot hood
off the pilot
assembly.

5/32" Hex

Use a hex wrench to
unscrew the orifice.

Remove the orifice and replace with the LP orifice. Screw the
orifice all the way in and replace the pilot hood.

LP (Propane) Orifice

Orifice Identification:

NG (Natural Gas) Orifice

35

62

35

a

b

c

NOTE

: when re-attaching,

this pin lines up with the
notch in the pilot hood.

5

Replace the firebox components.

Install the logs and embers. Replace the glass.

6

Remove and discard the screws (see “a” below) holding the stock regulator in place (see “b” below).

Remove the stock regulator and gasket (see “c” below). Place the LP regulator in place, making

sure the pre-fitted gasket (see”c” below) is in place. NOTE: There is a label on the base of the

regulator knob indicating regulator type (NG or LP). Secure the regulator with the screws included

with the regulator – tighten to 25 lb-in of torque (2.82 NM). Place the included label on the valve body

where it can be easily seen to insure proper identification. NOTE: Leak test this area after the
heater is installed, gas is connected, and the main burner is lit.

a

T-20 Torx or

Slotted Screwdriver

b

c

d

7

Make the gas line connection, bleed the gas line (if applicable), start the heater and thoroughly leak-

test all gas connections and the gas control valve.

Advertising