Rdvdsn series direct vent gas fireplace, Vertical sidewall installation twist lock pipe – Temco Tool 39RDVDSN User Manual

Page 16

Advertising
background image

16

RDVDSN Series Direct Vent Gas Fireplace

20007894

STEP 2
Measure wall thickness and cut zero clearance sleeve
parts to proper length (MAXIMUM 12”/305 mm). As-
semble sleeve and attach to firestop with #8 sheet
metal screws (supplied). Install firestop assembly. (Fig.
23)

Zero clearance sleeve is only required for
combustible walls.

STEP 3

Apply a bead of high temperature sealant to the inner
and outer flue collars of the fireplace and using ap-
propriate venting component(s), attach to fireplace with
three (3) screws. (Fig. 24) Follow with the installation
of the inner and outer elbow. Again secure joints with
three (3) sheet metal screws. Wipe off any excess high
temperature sealant.

ZCS101

Zero Clearance Sleeve

3/11/99 djt

Max. Length

12” (305mm)

#8 Screws (2)

#8 Screws

(2)

Adjustable
Zero Clearance
Sleeve

#8 Screws

(2)

Adjustable Zero Clearance Sleeve

ZCS101

Fig. 23 Adjustable zero clearance sleeve.

Firestop

VO584-100

Vent Opening

2/99 djt

Vent Opening for Combustible Wall

9³⁄₈”

(240mm)

9³⁄₈”

(240mm)

Fireplace Hearth

Framing

Detail

Opening for Noncombustible Wall

7¹⁄₂”

(190mm)

VO584-100

Fig. 22 Locate vent opening on wall.

STEP 1
Locate vent opening on the wall. It may be necessary
to first position the fireplace and measure to obtain hole
location. Depending on whether the wall is combustible
or noncombustible, cut opening to size. (Fig. 22) For
combustible walls first frame in opening.
NOTE: When using flex vent, the opening will have to
be measured according to the 1” (25 mm) rise in 24”
(610mm) vent run. (Minimum 1” (25 mm) rise)
Combustible Walls: (Fig. 22) Cut a 9³⁄₈”H x 9³⁄₈”W (240
x 240 mm) hole through the exterior wall and frame as
shown.
Noncombustible Walls: (Fig. 22) Hole opening must
be 7¹⁄₂” (190 mm) in diameter.

Vertical Sidewall Installation

Twist Lock Pipe

1

2

3

4

1 + 2 + 3 + 4 = 270

o

CFM132

Insert Rear Vent Sidewall

2/26/01 sta

Ensure Pipes

are Concentric

Bead of Sealant

(If necessary)

CFM143

Fig. 24 Apply sealant to inner and outer pipe.

STEP 4
Measure the horizontal length requirement including a
2” (51 mm) overlap, i.e. from the elbow to the outside
wall finish plus 2”, or the distance required if installing a
second 90° elbow. (Fig. 25)

Always install
horizontal vent-
ing on a level
plane.

CFM136

Rear Vent horizontal length

2/26/01 sta

X

CFM136

Fig. 25 Measure horizontal length including 2” overlap.

Advertising
This manual is related to the following products: