Assembly, Side hydraulic tank installation, Filling hydraulic reservoir – Tiger Products Co., Ltd CNH T6010-80 User Manual

Page 66: Installing o-ring fittings, Installing national pipe fittings, Preformed tube installation, General hose installation

Advertising
background image

ASSEMBLY

Assembly Section 2-34

SIDE HYDRAULIC TANK INSTALLATION

Install all fittings and tubes into tank and tank filter as shown in the Parts Section

illustration. Insert tank sight glass into front side of tank.

Place the tank in the mounting bracket on the main frame as shown in the Parts

Section. Secure the tank with the tank channel mount by placing the channel mount on top of
the tank and the washers over the holes. Thread the tie bolts through the washers and holes
to the threaded holes on the main frame. Tighten the tank channel mount by using the hex
heads on the end of the tie bolts.

Install the filter gauge into the filter housing so that it points to the rear of the tractor

and is clearly visible to the operator. The tank breather cap is ready for use as the tank is
filled. Some of the for-metioned items may be already installed.

(ASM-MOTOR HYDRO-0001)

FILLING HYDRAULIC RESERVOIR

Refer to the maintenance section for filling specifications and hydraulic oil requirements.

NOTE: Starting or running your Tiger mower before filling reservoir will cause
serious damage to hydraulic pump.

(ASM-C-0004hydro resrv)

INSTALLING O-RING FITTINGS

Installing straight, 45º and 90º O-rings requires that the O-ring and washer be up against the

swivel body. Insert the swivel and turn in until the swivel is pointed in the desired direction and O-
ring contact is made. Hold swivel in set direction with a wrench and turn the O-ring nut away
from the swivel body and carefully tighten.

(ASM-C-0056)

INSTALLING NATIONAL PIPE FITTINGS

Whenever installing a pipe fitting, wrap the threads clockwise (looking at the end) with teflon

tape. In this way, the tape will be tightened when installed. NOTE: It is not necessary to tape O-
ring fittings, or those installed in swivels.

(ASM-C-0088)

PREFORMED TUBE INSTALLATION

Lay booms on floor so that the side with the clamp plates is up. Locate all tube clamps and

install them loosely onto the clamp plates.

Arrange the tubes and hoses as outlined in the Common Parts Section. Install the tubes

closest to the boom arm first, being careful not to pinch the tubes. Place the other tubes outside
of the first tubes. Snug all clamp bolts, but do not tighten. Check all tubes for correct alignment
and that none are pinched or bent. The clamp bolts can now be tightened.

(ASM-C-0085)

GENERAL HOSE INSTALLATION

Refer to the parts section for detailed information about hoses and fittings for this application.

(ASM-C-0011)

Advertising