Chapter 2: hardware installation, Overview, Before you begin – Thecus Technology 1U4500R User Manual

Page 10: Hard disk installation, Cable connections

Advertising
background image


10

Chapter 2: Hardware Installation

Overview

Your 1U4500 is designed for easy installation. To help you get started, the
following chapter will help you quickly get your 1U4500 up and running. Please

read it carefully to prevent damaging your unit during installation.

Before You Begin

Before you begin, be sure to take the following precautions:

1. Read and understand the Safety Warnings outlined in the beginning of

the manual.

2. If possible, wear an anti-static wrist strap during installation to prevent

static discharge from damaging the sensitive electronic components on the
1U4500.

3. Be careful not to use magnetized screwdrivers around the 1U4500’s

electronic components.

Hard Disk Installation

The 1U4500 supports four standard 3.5” Serial ATA (SATA) hard disks. To install
a hard disk into the 1U4500, follow the steps below:

1. Remove a hard disk tray from the 1U4500.

2. Slide the new SATA hard disk into the tray and fasten the screws.

3. Insert the hard disk and tray back into the 1U4500 until it snaps into place

and lock it with a key if desired.

4. The LED blinks green when the hard disk is accessed. If the Error LED

flashes red it signals a problem.



Cable Connections

To connect the 1U4500 to your network, follow the steps below:

1. Connect an Ethernet cable from your network to the WAN port on the back

panel of the 1U4500.

NOTE

If your HDD was part of a RAID 1 or 5 array previously, it automatically rebuilds. If
you replace all the drives with higher capacity drives, you need to go to

Administrator login and format the drives.

Advertising
This manual is related to the following products: