Shelving installation / operation, True food service equipment, inc, Installation / operation instructions – True Manufacturing Company TCGG-72-S User Manual
Page 13
............ www.truemfg.com ............
True Food Service Equipment, Inc.
11
11
SHELVING INSTALLATION / OPERATION
INSTALLATION / OPERATION INSTRUCTIONS
INSTALLING BAKERY CASE
SHELVES
Step 1
A. Lift each door up and out of track
(do not disconnect elastic tubing).
Stretch elastic surgical tubing and
set doors on each side of unit.
B. Remove brackets, lights, shelves, etc.
from cabinet interior.
C. Locate shelf supports wrapped in
micro foam and install teeth end
into stainless pilasters located on
interior walls. Adjust to desired
height matching right and left pairs.
See Figure 1 & 2.
D. Locate three horizontal lights
wrapped in micro foam and install
(light side down). Electrical cords
should be on the right to plug into
side receptacle. Hang end hooks of
light assembly on two shelf supports
(left and right) slide assembly
forward until it seats in front notch
of shelf support. Then the stainless
steel shelf can be installed on the
shelf supports.
See figures 3.
Wire Shelf Support Brackets:
E. Install rear brackets by sliding
end hooks over rear notch of shelf
support.
See figures 4.
F. Locate wire shelves, install top shelf
first. With the front lip (tray stop)
up and towards cabinet front, place
on top of front light assembly and
snap wire shelf into (2) clips on top
of rear bracket. See figures 5.
G. Plug top light assembly into top
receptacle of cabinet interior.
See figures 5.
H. Repeat procedures for remaining
two wire shelves. See figures 6.
I. Replace doors in track.
NOTE
Lights will not operate if they are not
plugged in or plug cover is not plugged in.
Figure 1.
Figure 2.
Figure 3.
Figure 4.
Figure 5.
Figure 6.