Shelving installation / operation, True food service equipment, inc, Installation / operation instructions – True Manufacturing Company TCGG-72-S User Manual

Page 13

Advertising
background image

............ www.truemfg.com ............

True Food Service Equipment, Inc.

11

11

SHELVING INSTALLATION / OPERATION

INSTALLATION / OPERATION INSTRUCTIONS

INSTALLING BAKERY CASE

SHELVES

Step 1

A. Lift each door up and out of track

(do not disconnect elastic tubing).

Stretch elastic surgical tubing and

set doors on each side of unit.

B. Remove brackets, lights, shelves, etc.

from cabinet interior.

C. Locate shelf supports wrapped in

micro foam and install teeth end

into stainless pilasters located on

interior walls. Adjust to desired

height matching right and left pairs.

See Figure 1 & 2.

D. Locate three horizontal lights

wrapped in micro foam and install

(light side down). Electrical cords

should be on the right to plug into

side receptacle. Hang end hooks of

light assembly on two shelf supports

(left and right) slide assembly

forward until it seats in front notch

of shelf support. Then the stainless

steel shelf can be installed on the

shelf supports.

See figures 3.

Wire Shelf Support Brackets:

E. Install rear brackets by sliding

end hooks over rear notch of shelf

support.

See figures 4.

F. Locate wire shelves, install top shelf

first. With the front lip (tray stop)

up and towards cabinet front, place

on top of front light assembly and

snap wire shelf into (2) clips on top

of rear bracket. See figures 5.

G. Plug top light assembly into top

receptacle of cabinet interior.

See figures 5.

H. Repeat procedures for remaining

two wire shelves. See figures 6.

I. Replace doors in track.

NOTE

Lights will not operate if they are not

plugged in or plug cover is not plugged in.

Figure 1.

Figure 2.

Figure 3.

Figure 4.

Figure 5.

Figure 6.

Advertising
This manual is related to the following products: