Pilaster install/operation continued – True Manufacturing Company TR1RRI-1S User Manual

Page 16

Advertising
background image

............ www.truemfg.com ............

True Food Service Equipment, Inc.

14

14

Installation Procedures (Pilasters):
Install slotted thumb screws into threaded holes along

the inside wall of the cabinet.
Slide pilasters into position behind the slotted screws.

Leave all of the thumb screws loose for adjustments when

installing tray slides.
It is critical to measure from the center of the square hole

on the front pilaster to the center hole of the rear pilaster.

This measurement should be 24 5/8” (see image 13). Do

the same on the opposite side of cabinet for single door.

Make sure the measurement (24 5/8”) is the same in the

center pilasters in 2 and 3 door units. Tap the tray slides

into the Pilasters with a rubber Mallet.

Angle & Rod Type shelving uses a 18 1/8” distance

between Pilasters. Universal Tray slides have a 21 1/4”

distance between Pilasters (see image 14).
After the pilasters are installed the Universal Tray, Angle

Type Tray, and Rod Style Tray Slides will slide into the

pilasters (see images 7-12). When disassembling or changing

tray slides a rubber mallet may be used to take out the

different tray slides. Gently tap on the under side of the tray

slide to loosen it from the pilaster.

PILASTER INSTALL/OPERATION CONTINUED...

Type Kit #1 (Angle Type Tray Slide)

Type Kit #2 (Rod Style Tray Slide)

Type Kit #3 (Universal Tray Slide)

24 5/8

(Critical Measurement Front to Rear Pilasters)

18 1/8”

Angle Type

&

Rod Type

21 1/4”

Universal

Tray Slide

Top view (Critical Measurement side to side)

7

13

8

10

12

11

9

14

INSTALLATION / OPERATION INSTRUCTIONS

Advertising