Om/sm-hy-6e(ce) – Unified Brands HYPERSTEAM HY-6E(CE) User Manual

Page 23

Advertising
background image

OM/SM-HY-6E(CE) 

OM/SM-HY-6E(CE)

23

2. Lift the cover of the drain box. There are no fasteners

holding the cover on the drain box.

3. Tip the cover and note there is a circular hole in the

middle and the spray nozzle (with a hex head) is in
the center of the hole.

4. With a socket wrench, turn the spray nozzle in the

counter-clockwise direction to remove.

5. To install new nozzle, place pipe compound on the

nozzle threads, insert nozzle in socket wrench and
start the nozzle in the hole. Tighten nozzle.

6. Replace cover on drain box and lower vent pipe into

the drain box.

10.9 Steam Generator

P/N 096719

1. Shut off power and water to the steamer.

2. Disconnect the water inlet hose, steam hose and

drain hose by loosening the hose clamps and
working the hose off the respective fitting.

3. Disconnect the wires to the high and low water

probes.

4. Unplug the wires to the electric heaters. There are six

terminals for the high heat heaters and a set of two
pigtail wires for the low heat heater.

5. Remove the high limit thermostat box and disconnect

the two wires attached to this box.

6. With a socket wrench, remove the four 1/4-20 bolts

holding the steam generator to the steamer table.

7. The entire steam generator (with fittings attached)

may now be removed. Remove outer bolt from the
side and inner bolt from the rear.

8. Once the steam generator has been removed, the

fittings and heater elements may be transferred to
the new steam generator. Make sure that all screw
fittings are installed using high temperature pipe
compound.

NOTE: Refer to appropriate sections for detailed
instructions on fittings and heater assembly.

9. The steam generator is covered with an insulation

blanket. Carefully remove this blanket without tearing
it so that it can be reused on the replacement steam
generator.

To Install:

10. Carefully wrap the thermal blanket onto the steam

generator. Make sure it fits snugly with no air spaces
between the blanket and the steam generator. Fasten
seams with aluminum duct tape.

11. Position the steam generator in place and attach using

a socket wrench to install the four 1/4-20 bolts.

12. Attach wires to thermostat box and install box to

steamer.

13. Connect heater terminals. Make sure that the number

terminals on the wire harness correspond with the
numbers on the heater plate. Plug together the wires
for the low temperature heater.

14. Attach the water inlet hose, drain hose and steam

hose. Tighten hoses around fittings with hose clamps

10.10

Steam Generator Probes (High and Low
Water)
P/N 070178.

1. Shut off power to the steamer.

2. With a wrench LOOSEN, but do not remove the nuts

holding the wire(s) on the probe terminal(s)

3. The wires are connected to wire fork terminals. These

will "snap" on and off the terminal post. "Un-snap"
them by gently pulling on the terminal.

4. Using an open ended wrench, turn the probe counter-

clockwise to remove.

To Install:

5. Apply high temperature pipe compound to the probe

and screw it in by hand. Using an open ended wrench,
tighten the probe into the fitting.

6. Replace the wire(s) to the probes by snapping the fork

terminals around the terminal post. Using a wrench,
tighten the terminal nut.

NOTE: If two probes are to be replaced, either replace
them one at a time or note the color of the wires
attached to the probes. Do not get them mixed up.

10.11

Heater Assembly (Complete with High Limit
Thermostat
P/N 128697

1. Shut off power to the steamer.

2. Make sure all water is drained from the steam

generator(s).