Install the unit – Venmar HEPA 3100* User Manual

Page 14

Advertising
background image

5.4 I

NSTALLING

N

ON

-I

NSULATED

D

UCTS AND

R

EGISTERS

(

CONT

D

)

5.4.2 C

ENTRAL DRAW

P

OINT

(

AS ILLUSTRATED IN

S

ECTION

1.1.2) (

CONT

D

)

Fresh/Filtered air ductwork (Return side connection) (cont’d)

HEPA 3100, HF 3.1

AND

HEPA 4100

UNITS ONLY

(

CONT

D

)

• Fix the duct connector to the forced air unit duct using its 4 retaining screws (#8 x 3/4” long). Seal

with duct tape.

• Take one end of the 8’’ flexible duct and slide it over the duct connector. Secure with a tie wrap.

Carefully seal the connection with duct tape. Identifiy the duct using the blue sticker dot included.

• Attach this duct to the

FRESH AIR TO BUILDING

port (see icon on the top of the unit), using tie wrap and

duct tape.

5.4.3 R

ETURN

-

TO

-R

ETURN

(

AS ILLUSTRATED IN

S

ECTIONS

1.1.3

AND

1.2.2)

Fresh/Filtered air ductwork (Return side connection)

Same as for Central Draw Point, described in point 5.4.2.
Stale air ductwork (Return side connection)

A

LL UNITS

• Locate the stale air ductwork opening at least 3’ (0.9 m) from the fresh/filtered air ductwork

connection. For the HRV 2600 and HR 2.6 units, use a steel transition (not provided, available
in hardware stores). Proceed as for the fresh/filtered air ductwork, but instead of using the blue
dot sticker to identify the duct, use the red dot. (No dots for HRV 2600 and HR 2.6 units.)

• Attach this duct to the

EXHAUST AIR FROM BUILDING

port (see icon on the top of the unit), using tie wrap

and duct tape.

5. INSTALL THE UNIT

(CONT’D)