Venmar HEPA 3100* User Manual

Page 7

Advertising
background image

- 7 -

2.3 M

OUNTING AND

S

ERVICING

C

ONSIDERATIONS

The two following pictures are showing the minimum clearance needed to open the door completely.

22.5” 15.75”

(572 mm) (400 mm)

VD0117

VD0116

22”

(559 mm)

NOTE: A minimum of 8” (203 mm) clearance from any obstruction on top of the unit is required for the ductwork radius turn.

8”

(203 mm)

VD0118A

8 ¾”

222 mm

9 ¾”

248 mm

• The joist opening needed to install the Tandem® tansition (included in

both installation kits) must be 9 ¾” (248 mm) minimum. Also, the maximum
height of the Tandem transition is 8 ¾” (222 mm). See Tandem transition
end view beside.

2.2 HEPA 3100, HF 3.1

AND

HEPA 4100 U

NITS

FRONT VIEW

TOP VIEW

2.1 HRV 2600

AND

HR 2.6 U

NITS

FRONT VIEW

TOP VIEW

17.8''

(452 mm)

30.2''

(767 mm)

22.9'' (581 mm)

VK0049A

Advertising