Wayne-Dalton 8850 User Manual

Page 13

Advertising
background image

13

Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your

local yellow pages/business listings or go to the

Find a Dealer section online at www.wayne-dalton.com

Tools Needed:

iNST

alla

Tio

N

9

Step Plate

Position your step plate, on the inside of

the door, over the bottom section end stile

on the side of the door containing the side

lock. Secure step plate to endstile with (2)

5/16” x 1” self drilling screws, as shown.

for doors ordered with non-keyed locks,

a second step plate is provided. Install the

second step plate in the same manner as

the first, on the lock section (second section),

below the side lock.
NoTe: Install lock at this time (sold

separately) see instructions in OPTIONAL

SIDELOCK INSTALLATION on page 22.
NoTe: Install exhaust port at this time (sold

separately) see instructions in OPTIONAL

EXhAUST PORT INSTALLATION on page

24.

END STILE

(2) 5/16” X 1” SELf

DRILLING SCREWS

BOTTOM SECTION

STEP PLATE

LOCK SECTION

If SECOND STEP PLATE WAS

RECEIVED fOR DOORS ORDERED

WITh NON-KEYED LOCKS, INSTALL

IT BELOW ThE SIDE LOCK.

Tools Needed:

10

Top Section

hammer

Nail

Power Drill

7/16 Socket

Driver

Tape Measure

Place the top section in the opening and

vertically align with lower sections.
Temporarily secure the top section by

driving a nail in the header near the center

of the door and bending it over the top

section.
Now flip up hinge leaf against section,

fastening center hinges first, and end

hinges last. (Refer to Step 5).
When installing a door with a torsion

counterbalance system, vertical track

alignment is critical. Position flagangle

between 1-11/16” (43 mm) to 1-3/4” (44

mm) from the edge of the door. Tighten

the bottom lag screw. flagangles must be

parallel to the door sections.
Repeat for opposite side.
imPoRTaNT: ThE DIMENSION BETWEEN

ThE fLAGANGLES MUST BE DOOR WIDTh

PLUS 3-3/8” (86MM) TO 3-1/2” (89 MM)

fOR SMOOTh, SAfE DOOR OPERATION.
Complete the vertical track installation by

securing the center jamb bracket(s) and

tightening the other lag screws.
Push the vertical track against the rollers

so that the rollers are touching the

deepest part of the curved side of the

track (see illustration). Tighten all the

carriage bolts and nuts.
Repeat for opposite side.

DOOR WIDTh

+3-3/8” TO 3-1/2”

NAIL

ROLLER

VERTICAL TRACK

ROLLER AGAINST
VERTICAL TRACK

TOP SECTION

TOP

SECTION

1-11/16”
TO
1- 3/4”

fLAGANGLE

TOP

SECTION

Advertising