Installa tion - moun ting the r ange hood – Zephyr ATI-M90ABX User Manual

Page 18

Advertising
background image

www.zephyronline.com

WARNING: In order to facilitate their connection, make sure that the power

supply conduits are not obstructed by the hood.

3. When the hood has been adjusted tighten the screws to secure the hood

in place.

4. Once the adjustment has been completed, fi x the hood defi nitely using

another (2 type D) screws.

NOTE: Screws must be fastened into wooden studs so wood blocking may be
necessary. If using wall anchors make sure to check your local codes for suita-
bility and type of anchors to use.

NOTE1: For the various installations use screws and screw anchors suited to the
type of wall (minimum screw size: 1/4" diameter x 2-3/4" length).

NOTE2: The following Duct Cover kits are available as acessories: Z1C-00TI,
Z1C-01TI

Installa

tion - Moun

ting the R

ange Hood

- 18 -

Advertising